论文部分内容阅读
介绍了滨州黄河公路大桥 ,为满足设计对混凝土入模温度的要求 ,采取的加冰冷却工艺 ,也同时介绍了施工中采取的其他辅助措施。
Binzhou Yellow River Highway Bridge was introduced. In order to meet the design requirements of the mold temperature, the ice cooling technique was introduced, and other auxiliary measures taken during the construction were also introduced.