Determining the rational layout parameters of the lateral high drainage roadway serving for two adja

来源 :International Journal of Mining Science and Technology | 被引量 : 0次 | 上传用户:bitbooy
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
To determine the rational layout parameters of the lateral high drainage roadway(LHDR) serving for two adjacent working faces, a mechanical model of the LHDR under mining influence was established, and the overburden fissure, mining-induced stress distribution rules were analyzed. First, the development characteristics of mining-induced overburden fissure and the stress distribution law of the upper section of the working face were analyzed. Second, by analyzing the distribution law of vertical stress at different layers, the lateral distance of the LHDR was determined as 25 m. Third, by analyzing the surrounding rock deformation effect, stress distribution law, and overburden fissure distribution law of the LHDR at the heights of 20, 25, and 30 m away from the roof, the rational horizon of the LHDR was determined to be 25 m. Finally, an example of a LHDR located 25 m above the roof of the No. 2 coal seam and 25 m away from the No. 2-603 working face was presented. Results show that when the No. 2-603 coalface is being mined, the surrounding rocks lag 80 m or even further and the working face tends to be stable. The relative deformations of the roof and floor of the roadway and both of its walls were 583 and 450 mm,respectively. The reduction rate of the roadway section was 21.52%–25.32%. The section of the roadway was sufficient to extract the pressure relief gas in the overburden of the No. 2-605 working face. The average gas concentration and the pure volume at the branch pipeline were 24.8% and 22.3 m~3/min,respectively, showing that the position of high-level boreholes was reasonable. To determine the rational layout parameters of the lateral high drainage roadway (LHDR) serving for two adjacent working faces, a mechanical model of the LHDR under mining influence was established, and the overburden fissure, mining-induced stress distribution rules were analyzed. First, the development characteristics of mining-induced overburden fissure and the stress distribution law of the upper section of the working face were analyzed. Second, by analyzing the distribution law of vertical stress at different layers, the lateral distance of the LHDR was determined as 25 m Third, by analyzing the surrounding rock deformation effect, stress distribution law, and overburden fissure distribution law of the LHDR at the heights of 20, 25, and 30 m away from the roof, the rational horizon of the LHDR was determined to be 25 m. Finally, an example of a LHDR located 25 m above the roof of the No. 2 coal seam and 25 m away from the No. 2-603 working face was presented. Results show that wh the relative deformations of the roof and floor of the roadway and both of its walls were 583 and 450 mm, respectively. The reduction rate of the roadway section was 21.52% -25.32%. The section of the roadway was sufficient to extract the pressure relief gas in the overburden of the No. 2-605 working face. The average gas concentration and the pure volume at the branch pipeline were 24.8% and 22.3 m ~ 3 / min, respectively, showing that the position of high-level boreholes was reasonable.
其他文献
期刊
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
自2010年以来,重庆市长寿区积极开展救灾物资储备库建设,从1个区级中心储备库拓展到6个镇级储备室,基本形成了“一库六室”的救灾物资储备体系,探索出一条仓库储备与协议储备
期刊
近几年来,随着我国经济的发展,目前我国装饰装修行业发展呈现了快速发展的势头,据国家住建部发布的统计数字表明,全国装饰装修行业经济发展指标每年都保持着两位数字的增长态
结合压力容器在制造中易产生变形的问题,本文对压力容器常见的钢材弯曲变形、切割边变形、焊接变形、加工成型变形和热处理变形等变形展开了分析,并分别针对各种变形提出了预
期刊
面临耐药性致病菌的逐年增加,新型抗菌药物亟待开发.众所周知,新药开发是一个艰难和复杂的过程.制定合理给药方案是药物开发的重要课题,而以制定抗菌药物的合理给药方案最富