施工现场平整时,首先遇到的问题是计算设计场地平整标高,算出填、挖方工程量。最理想的设计标高,是不在其它地方取土和弃土,达到场内填挖方量平衡。通常标高计
When the construction site is leveled, the first problem encountered is that the design site should be leveled and the filling and excavation work volume should be calculated. The most ideal design elevation is to not take soil and spoil in other places, and to balance the volume of filling and excavation in the field. Normal elevation meter