论文部分内容阅读
结合雅砻江流域特大型水电站计算机监控系统的优化设计方案,对如何提高系统的可靠性及稳定性进行了分析并提出了相应措施,并着重对监控系统的网络及结构配置的优化设计、信号抗干扰与防雷、供电可靠性、软件防误等方面进行了阐述,为特大型水电站计算机监控系统的设计和老项目的升级改造提供了参考。
Based on the optimization design of computer monitoring system for Yalong River large hydropower station, this paper analyzes how to improve the reliability and stability of the system and puts forward corresponding measures. The optimal design of the network and structure of the monitoring system is emphasized. The signal Anti-interference and lightning protection, power supply reliability, software error-proofing and other aspects were described for the super large-scale hydropower station computer monitoring system design and upgrading of old projects provide a reference.