针对吹砂填海的地质特点,结合京唐公司一期排水管网建设的经验及教训,对二期排水管网建设进行了优化设计研究。二期排水管道采用PE管道,连接方式为热熔焊接,解决了管道接口渗漏的问题,并根据管道埋深采用不同等级的管道;设计出一种带翼环整体式管件的井室与管道的连接方法,解决了PE管道与井室密封不严的问题;在局部排热水的地方设置伸缩节井室取代排水检查井,既可以调节PE管道因热胀冷缩产生的位移,还具有临时替代排水检查井的作用;根据地质条件,综合考虑经济及技术因素,采用注浆的方法对排水检查井基础进行加固处理。
According to the geological characteristics of the reclaimed sand and reclaimed land, combined with the experiences and lessons learned from the construction of the first phase of the drainage network of Jingtang Company, the optimal design of the second phase of the drainage network was studied. The second phase of the drainage pipe using PE pipe, the connection method for the hot-melt welding, to solve the problem of pipeline interface leakage, and according to the depth of the pipeline using different levels of pipeline; designed with a wing ring monolithic pipe wells and pipe Of the connection method to solve the problem of tight sealing of the PE pipe and the well room; the installation of a telescopic reduction and well-killing room instead of the drainage inspection well in the place of local hot water not only can adjust the displacement of the PE pipe due to thermal expansion and contraction, Temporarily replace the role of drainage inspection wells; based on geological conditions, taking into account economic and technical factors, the use of grouting method for the foundation of the drainage inspection wells reinforcement.