论文部分内容阅读
高墩滑式翻模施工工艺是将滑模施工和翻模施工2种工艺相结合,综合了滑膜和翻模2种施工工艺的优点,克服了滑膜和翻模施工工艺的缺点。本文结合大循高速路基1标卧龙沟8号大桥高墩施工,通过滑式翻模和常规翻模2种工艺的比较分析,对滑式翻模施工工艺的优势进行阐述。
The construction technology of high-rise slide-slip turn-over mold combines the two kinds of process of slip-form construction and turn-over construction, and combines the advantages of two kinds of construction technology of the synovial film and turn over mold to overcome the shortcomings of the construction technology of the sliding film and turn over mold. In this paper, the construction of the high pier of Wulonggou Bridge 8, a subgrade of Daxun Expressway, is introduced. By comparing the two kinds of technology of sliding mode and conventional mode, the advantages of the construction mode of the slide mode are introduced.