2012年,云南电网面临的形势是“一重两大六不定”(安全生产任务重;安全生产压力大、电网风险大;来水不定、来煤不定、自然灾害不定、电力建设项目投产时间不定、负荷不定、外送不定),形势异常严峻。但是在如此困难的形势下,电网、电厂、用户,在省委省政府还有电监办大力支持下,齐心协力,攻坚克难,很好地保障了电网的安全运行,最大限度的满足了我们全省电力的供应,成绩有目共睹。
In 2012, the situation faced by Yunnan Power Grid is "(heavy task of production safety; heavy pressure on production safety, power grid risk; uncertain water, uncertainties in coal, natural disasters, power construction project put into operation Uncertain, uneven load, irregular delivery), the situation is extremely serious. However, in such a difficult situation, the power grids, power plants and users, with the strong support from the provincial party committee and government and the electricity monitoring commission, worked together to tackle the difficulties and ensured the safe operation of the power grid to the maximum extent possible Our power supply in the province, the results for all to see.