Numerical simulation of dewatering thick unconsolidated aquifers for safety of underground coal mini

来源 :Mining Science and Technology | 被引量 : 0次 | 上传用户:nicop
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
With an increase of mining the upper limits under unconsolidated aquifers, dewatering of the bottom aquifer of the Quaternary system has become a major method to avoid water and sand inrushes.In the 8th District of the Taiping Coal Mine in south-western Shandong province, the bottom aquifer of the Quaternary system is moderate to excellent in water-yielding capacity.The base rock above the coal seam is very thin in the concealed coal field of the Carboniferous and Permian systems.Therefore, a comprehensive dewatering plan from both the ground surface and the panel was proposed to lower the groundwater level in order to ensure mining safety.According to the hydrogeologic conditions of the 8th District, we established a numerical model so that we could simulate the groundwater flow in the dewatering process.We obtained the simulation parameters from previous data using backward modeling, such as the average coefficient of permeability of 12 m/d and the elastic storage coefficient of 0.002.From the same model, we predicted the movement of groundwater and water level variables and obtained the visible effect of the dewatering project.Despite the overburden failure during mining, no water and/or sand inrush occurred because the groundwater level in the bottom aquifer was lowered to a safe water level. With an increase of mining the upper limits under unconsolidated aquifers, dewatering of the bottom aquifer of the Quaternary system has become a major method to avoid water and sand inrushes. The 8th District of the Taiping Coal Mine in south-western Shandong province, the bottom aquifer of the quaternary system is moderate to excellent in water-yielding capacity. base rock above the coal seam is very thin in the concealed coal field of the carboniferous and permian systems.Therefore, a comprehensive dewatering plan from both the ground surface and the panel was proposed to lower the groundwater level in order to ensure mining safety. Accredited to the hydrogeologic conditions of the 8th District, we established a numerical model so that we could simulate the groundwater flow in the dewatering process. previous data using backward modeling, such as the average coefficient of permeability of 12 m / d and the elastic storage coefficient of 0.00 2.From the same model, we predicted the movement of groundwater and water level variables and obtained the visible effect of the dewatering project. Ideally the overburden failure during mining, no water and / or sand inrush occurred because the groundwater level in the bottom aquifer was lowered to a safe water level.
其他文献
一、水平对比法概述水平对比法(Benchmarking)又称标杆瞄准、标杆管理,是现代西方发达国家企业管理活动中支持企业不断改进和获得竞争优势的最重要的管理方式之一,西方管理学
连续预压机升降位移准确性对压制板坯具有重要影响。应用电流测量法校正升降位移传感器的零点,并通过测量主油缸实际位移和传感器返回的电流值对位移传感器进行线性标定。结
梁漱溟是一位信奉佛教而又蜚声海内外的儒学大师,性格耿直,敢说敢为,由于某些“自视太高”和“固执己见”的缘故,而有“傲人”之称。他是毛泽东的挚友、诤友,也是一位身份特别的、
建一个什么样的党,怎样建党,是中国共产党人始终关注的核心问题。 1921年7月23日,中国共产党在上海成立,通过了中国共产党第一个纲领。纲领明确提出了党的基本任务和奋斗目
分析了当代煤炭企业面临的环境问题,提出了建设生态矿区的方法与措施。 This paper analyzes the environmental problems facing contemporary coal enterprises and puts
党的十三届四中全会以来的13年,是建设有中国特色社会主义伟大事业不断开拓前进的13年,也是当代中国的马克思主义在新的实践中不断丰富发展的13年。以江泽民为核心的第三代中央
扩大干部工作中的民主,既是继续深化干部制度改革的一个重要问题,也是干部工作实践中需要着力解决的一个现实问题。本文拟就这一问题作一些探讨。 一、扩大干部工作中的民主
中国科学院新疆理化技术研究所的研究人员采用高温碳化金属有机骨架化合物(MOF)制备的N原位掺杂的微孔碳作为工作电极的修饰材料,可用于镉离子和铅离子等重金属离子的电化学
发展党员工作是党的建设的一项基础工作,做好这项工作,对于加强党的基层组织建设,提高党员队伍的素质,增强党的凝聚力、战斗力,具有十分重要的意义。最近,笔者在基层调研中发现,少数
随着开采深度的增加,深井大型硐室围岩控制与支护越来越困难。文章针对滕东生建煤矿采区泵房大埋深、松软围岩等工程条件,采用锚网索喷高强耦合一次支护,以最大限度的利用硐