五龙岭隧道由于其特殊的地形地质情况,使该隧道具有大跨、浅埋、软弱不良地质和偏压等四大难点。本文通过对五龙岭隧道的施工方案、施工重点、监控量测等方面的介绍,总结了本工程的一些基本经验。
Wulongling tunnel due to its special topography and geology, so that the tunnel has a large span, shallow buried, poor geological and biased four major difficulties such as bias. This article summarizes some basic experiences of this project by introducing Wulongling tunnel construction scheme, construction focus and monitoring measurement.