论文部分内容阅读
【摘要】随着我国经济的飞速发展,水利工程施工也越来越多,而水利工程施工管理是一项涉及面广、涉及学科范围大的课题,水利工程施工管理的成功与否,直接影响到整个项目建设的质量、成本与进度。本文就如何加强水利工程施工管理中进度、质量等几个要素进行了论述,提出了自已的观点。
【关键词】水利工程;施工管理;成本;进度;质量
Discussion on Strengthening Construction Management of Water Conservancy Project
Sun Shang-sheng
(Administration of nansi lake of zaozhuang koto dikeZaozhuangShandong277000)
【Abstract】With the rapid development of China's economy, water conservancy construction is more and more, and water conservancy construction management is a wide area involving a wide range of subjects, water conservancy construction management success or not directly affect the entire project Construction quality, cost and schedule. In this paper, how to strengthen the construction of water conservancy project management progress, quality and other elements were discussed, put forward their own point of view.
【Key words】Water conservancy project;Construction management;Cost;Schedule;
工程质量是国家经济、技术水平的体现,是一个民族科学文化素质的重要标志。水利工程项目施工涉及面广,是一个极其复杂的过程,影响质量的因素很多,如设计、材料、机械、管理制度等,均直接影响着工程项目的施工质量。工程质量的优劣不但会影响建筑物的寿命和效益,而且会影响改建和维修的费用,更严重的是一旦失事,对国民经济及生命财产会带来不可弥补的损失,因此,水利工程施工必须保证施工质量。
1. 水利工程施工中质量存在的问题
法律、法规不健全、不完善,执法不力,质量监督处罚可操作性不强。项目法人中的组织机构人员质量意识淡薄,重视工期,轻视质量。项目部人员素质不高,缺少高水平的管理人才,项目管理科学化决策少,相关的技术支持比较少,随意性较大。无检测手段,质量评定缺乏权威性。质监机构为事业或企业编制,收费标准低,财力、人力所限,工作难以深入到位。质监员专业知识水平有限,监督起来力不从心。质量管理职能交叉,责任不明,质量问题难整改,质量监督机构作用难发挥。
1.1原材料的质量问题。混凝土工程使用的水泥、粉煤灰、外加剂等属厂家生产产品,其砂石骨料通常使用坝址附近河床开采的砂石料或开采块石料加工制成品料。目前,有的厂家出厂的产品未达到国家标准,是伪劣产品,有的工程砂石骨料质量也存在一些问题,但因工程施工急需,只得"凑合"使用,造成混凝土质量不稳定。
1.2承包单位偷工减料,有的工程施工单位层层转包,由于转包单价偏低,承包单位就搞偷工减料,为欺骗监理单位,就不择手段造假资料蒙混过关。
1.3施工单位现场管理力度不够。施工队伍设备投入少、技术水平低。施工主要技术工人及工程师配置不足,施工的主要核心管理网络不完善,缺少专业的相对固定的施工班组,造成施工组织的杂乱无章、低级错误不断。施工过程中技术监督与管理不到位。
2. 提高水利工程施工质量控制
工程施工是一种物质生产活动,因此,影响工程质量的因素有五大方面,即"人、材料、机械、技术、环境",施工阶段质量控制就是要对五个质量因素进行全面的控制。
2.1人的质量控制。工程质量取决于工序质量和工作质量,而工作质量取决于工程建设的直接参与者,参与建设的人员的技术水平、文化修养、心理行为、职业道德、身体条件等因素,直接影响到工程质量的好坏。人作为控制的对象,要充分调动人的积极性,以发挥"人是第一因素"的主导作用。首先,要有合格的现场施工管理人员,施工管理工作具有专业交叉渗透、覆盖面宽的特点,施工管理人员不仅要有一定深度的理论知识和专业技术水平,还要有一定的法律、经济、行政管理的知识和经验,更需要具备丰富的工程时间经验和遇到突发实践的应急经验。
2.2材料的质量控制。工程项目是由各种建筑材料、辅助材料、成品、半成品构配件等构成的实体,这些构成物本身的质量及其质量控制工作,对工程质量具有十分重要的影响。由此可见,材料质量是工程质量的基础,材料质量不符合要求,工程质量也就不符合标准。所以加强材料的质量控制,是提高工程质量的重要保证。因此,建筑材料到达现场后,应按国家规范的要求对到场的材料和产品,进行严格的检查和验收,并且正确合理的使用,建立管理台帐,做好收、发、储、运等各个环节的技术管理,并防止因运输路途的保管不正确而出现质量问题的材料和设备进入现场。许多材料只有制造单位的有关资料,还不能确定其是否适用的,必须进行试验。施工企业应填写好建筑材料报验单,详细说明材料来源、产地、材料规格、用途以及施工承包商的试验情况。还要说明材料预计到货日期。上述材料报验单应连同材料出厂质量保证书和材料自检试验报告,一并送监理审核。 2.3机械设备的质量控制。施工机械设备是工程项目实施的重要物质基础,施工机械设备的选型,应根据设备的施工适用性、操作方便、使用安全、保证施工质量的可靠性和经济上的合理性。如疏浚工程应根据地质条件、疏浚面积、深度等因素,分别选择抓斗式、链斗式、吸扬式等不同形式的挖泥船。施工机械设备主要性能参数的选择,可根据工程特点、施工条件和已确定的机械设备形式,来选定具体的机械。如堆石坝施工所采用的振动碾,其性能参数主要是压实功能和生产能力,在已选定牵引式振动碾的情况下,应选择能够在规定的铺筑厚度下,振动碾压6~8遍以后,就能使填筑坝料的密度达到设计要求的振动碾。
2.4施工方法或工艺的质量控制。施工方案合理与否、施工方法和工艺先进与否,均会对施工质量产生极大的影响,是直接影响工程项目的进度控制、质量控制、投资控制三大目标能否顺利完成的关键。在制定施工方案和施工工艺时,必须结合工程实际,从技术、管理、经济、组织等方面进行全面分析,综合考虑,采取科学合理的施工方法,确保施工方案、施工工艺在技术上可行,在经济上合理,且有利于提高施工质量。对施工方法的控制,可从以下几点着手:首先施工方案应随工程的进展而不断细化和深化;其次在施工方案选择时,对主要的施工项目要事先拟订几个可行的方案,找出主要矛盾,明确各方案的优缺点,通过反复论证和比较,选出最佳方案;另外对主要项目的关键部位和难度较大的项目,如新工艺、大跨度、高大结构部位等,制定方案时应充分考虑到可能发生的施工质量问题及处理的方法。
2.5环境因素的质量控制。环境因素主要有技术环境、施工管理环境及自然环境。技术环境因素包括施工所用的规程、规范、设计图纸及质量评定标准。施工管理环境因素包括质量保证体系、三检制、质量管理制度、质量签证制度、质量奖惩制度等。自然环境因素包括工程地质、水文、气象、温度等。这些因素对施工质量的影响具有复杂而多变的特点,尤其是某些环境因素更是如此。因此,加强环境控制,改进作业条件,把握好技术环境,辅以必要措施,是控制环境对质量影响的重要保证。
3. 如何提高水利工程进度控制
进度控制作为工程项目建设的三大控制目标,是十分重要的。工程进度失控,必然导致人力、物力的增加,甚至可能影响工程质量和安全。拖延工期后赶进度,建设的直接费用将会增加,工程质量也容易出现问题。在关键时刻(如截流、下闸蓄水)赶不上工期,错过有利的施工机会,将会造成重大损失。如果工期大幅度拖延,工程不能按期投产受益,这种损失将是巨大的,直接影响工程的投资效益。延误工期固然会导致经济损失,盲目地、不协调地加快工程进度,同样也是片面的,也会增加大量的非生产性支出。工程建设各部位的施工进度统一步调,与资金投入、设备供应、材料供应以及移民征地等方面协调一致,并适应现场气候、水文、气象等自然规律,才能取得良好的经济效果。因此,进度控制就是以周密、合理的进度计划为指导,对工程施工进度进行跟踪检查、分析、调整与控制。
4. 结束语
由于水利工程有自身的特点,使得水利工程质量控制任务既复杂又繁重。工程质量责任重于泰山。加强水利工程质量管理,确保工程质量是水利建设永恒的主题。如何采取有效措施, 提高水利工程质量是当前重要课题之一。
参考文献
[1]勒思东,陈文会.水利施工管理中应注意的几个问题[J].山西水利科技,2004,(3).
[2]邵江海,孟国荣.对建筑施工管理的思考[J].黑龙江科技信息,2008.
[3]王平平.浅议水利工程施工管理[J].中国水运,2007,(1).
【关键词】水利工程;施工管理;成本;进度;质量
Discussion on Strengthening Construction Management of Water Conservancy Project
Sun Shang-sheng
(Administration of nansi lake of zaozhuang koto dikeZaozhuangShandong277000)
【Abstract】With the rapid development of China's economy, water conservancy construction is more and more, and water conservancy construction management is a wide area involving a wide range of subjects, water conservancy construction management success or not directly affect the entire project Construction quality, cost and schedule. In this paper, how to strengthen the construction of water conservancy project management progress, quality and other elements were discussed, put forward their own point of view.
【Key words】Water conservancy project;Construction management;Cost;Schedule;
工程质量是国家经济、技术水平的体现,是一个民族科学文化素质的重要标志。水利工程项目施工涉及面广,是一个极其复杂的过程,影响质量的因素很多,如设计、材料、机械、管理制度等,均直接影响着工程项目的施工质量。工程质量的优劣不但会影响建筑物的寿命和效益,而且会影响改建和维修的费用,更严重的是一旦失事,对国民经济及生命财产会带来不可弥补的损失,因此,水利工程施工必须保证施工质量。
1. 水利工程施工中质量存在的问题
法律、法规不健全、不完善,执法不力,质量监督处罚可操作性不强。项目法人中的组织机构人员质量意识淡薄,重视工期,轻视质量。项目部人员素质不高,缺少高水平的管理人才,项目管理科学化决策少,相关的技术支持比较少,随意性较大。无检测手段,质量评定缺乏权威性。质监机构为事业或企业编制,收费标准低,财力、人力所限,工作难以深入到位。质监员专业知识水平有限,监督起来力不从心。质量管理职能交叉,责任不明,质量问题难整改,质量监督机构作用难发挥。
1.1原材料的质量问题。混凝土工程使用的水泥、粉煤灰、外加剂等属厂家生产产品,其砂石骨料通常使用坝址附近河床开采的砂石料或开采块石料加工制成品料。目前,有的厂家出厂的产品未达到国家标准,是伪劣产品,有的工程砂石骨料质量也存在一些问题,但因工程施工急需,只得"凑合"使用,造成混凝土质量不稳定。
1.2承包单位偷工减料,有的工程施工单位层层转包,由于转包单价偏低,承包单位就搞偷工减料,为欺骗监理单位,就不择手段造假资料蒙混过关。
1.3施工单位现场管理力度不够。施工队伍设备投入少、技术水平低。施工主要技术工人及工程师配置不足,施工的主要核心管理网络不完善,缺少专业的相对固定的施工班组,造成施工组织的杂乱无章、低级错误不断。施工过程中技术监督与管理不到位。
2. 提高水利工程施工质量控制
工程施工是一种物质生产活动,因此,影响工程质量的因素有五大方面,即"人、材料、机械、技术、环境",施工阶段质量控制就是要对五个质量因素进行全面的控制。
2.1人的质量控制。工程质量取决于工序质量和工作质量,而工作质量取决于工程建设的直接参与者,参与建设的人员的技术水平、文化修养、心理行为、职业道德、身体条件等因素,直接影响到工程质量的好坏。人作为控制的对象,要充分调动人的积极性,以发挥"人是第一因素"的主导作用。首先,要有合格的现场施工管理人员,施工管理工作具有专业交叉渗透、覆盖面宽的特点,施工管理人员不仅要有一定深度的理论知识和专业技术水平,还要有一定的法律、经济、行政管理的知识和经验,更需要具备丰富的工程时间经验和遇到突发实践的应急经验。
2.2材料的质量控制。工程项目是由各种建筑材料、辅助材料、成品、半成品构配件等构成的实体,这些构成物本身的质量及其质量控制工作,对工程质量具有十分重要的影响。由此可见,材料质量是工程质量的基础,材料质量不符合要求,工程质量也就不符合标准。所以加强材料的质量控制,是提高工程质量的重要保证。因此,建筑材料到达现场后,应按国家规范的要求对到场的材料和产品,进行严格的检查和验收,并且正确合理的使用,建立管理台帐,做好收、发、储、运等各个环节的技术管理,并防止因运输路途的保管不正确而出现质量问题的材料和设备进入现场。许多材料只有制造单位的有关资料,还不能确定其是否适用的,必须进行试验。施工企业应填写好建筑材料报验单,详细说明材料来源、产地、材料规格、用途以及施工承包商的试验情况。还要说明材料预计到货日期。上述材料报验单应连同材料出厂质量保证书和材料自检试验报告,一并送监理审核。 2.3机械设备的质量控制。施工机械设备是工程项目实施的重要物质基础,施工机械设备的选型,应根据设备的施工适用性、操作方便、使用安全、保证施工质量的可靠性和经济上的合理性。如疏浚工程应根据地质条件、疏浚面积、深度等因素,分别选择抓斗式、链斗式、吸扬式等不同形式的挖泥船。施工机械设备主要性能参数的选择,可根据工程特点、施工条件和已确定的机械设备形式,来选定具体的机械。如堆石坝施工所采用的振动碾,其性能参数主要是压实功能和生产能力,在已选定牵引式振动碾的情况下,应选择能够在规定的铺筑厚度下,振动碾压6~8遍以后,就能使填筑坝料的密度达到设计要求的振动碾。
2.4施工方法或工艺的质量控制。施工方案合理与否、施工方法和工艺先进与否,均会对施工质量产生极大的影响,是直接影响工程项目的进度控制、质量控制、投资控制三大目标能否顺利完成的关键。在制定施工方案和施工工艺时,必须结合工程实际,从技术、管理、经济、组织等方面进行全面分析,综合考虑,采取科学合理的施工方法,确保施工方案、施工工艺在技术上可行,在经济上合理,且有利于提高施工质量。对施工方法的控制,可从以下几点着手:首先施工方案应随工程的进展而不断细化和深化;其次在施工方案选择时,对主要的施工项目要事先拟订几个可行的方案,找出主要矛盾,明确各方案的优缺点,通过反复论证和比较,选出最佳方案;另外对主要项目的关键部位和难度较大的项目,如新工艺、大跨度、高大结构部位等,制定方案时应充分考虑到可能发生的施工质量问题及处理的方法。
2.5环境因素的质量控制。环境因素主要有技术环境、施工管理环境及自然环境。技术环境因素包括施工所用的规程、规范、设计图纸及质量评定标准。施工管理环境因素包括质量保证体系、三检制、质量管理制度、质量签证制度、质量奖惩制度等。自然环境因素包括工程地质、水文、气象、温度等。这些因素对施工质量的影响具有复杂而多变的特点,尤其是某些环境因素更是如此。因此,加强环境控制,改进作业条件,把握好技术环境,辅以必要措施,是控制环境对质量影响的重要保证。
3. 如何提高水利工程进度控制
进度控制作为工程项目建设的三大控制目标,是十分重要的。工程进度失控,必然导致人力、物力的增加,甚至可能影响工程质量和安全。拖延工期后赶进度,建设的直接费用将会增加,工程质量也容易出现问题。在关键时刻(如截流、下闸蓄水)赶不上工期,错过有利的施工机会,将会造成重大损失。如果工期大幅度拖延,工程不能按期投产受益,这种损失将是巨大的,直接影响工程的投资效益。延误工期固然会导致经济损失,盲目地、不协调地加快工程进度,同样也是片面的,也会增加大量的非生产性支出。工程建设各部位的施工进度统一步调,与资金投入、设备供应、材料供应以及移民征地等方面协调一致,并适应现场气候、水文、气象等自然规律,才能取得良好的经济效果。因此,进度控制就是以周密、合理的进度计划为指导,对工程施工进度进行跟踪检查、分析、调整与控制。
4. 结束语
由于水利工程有自身的特点,使得水利工程质量控制任务既复杂又繁重。工程质量责任重于泰山。加强水利工程质量管理,确保工程质量是水利建设永恒的主题。如何采取有效措施, 提高水利工程质量是当前重要课题之一。
参考文献
[1]勒思东,陈文会.水利施工管理中应注意的几个问题[J].山西水利科技,2004,(3).
[2]邵江海,孟国荣.对建筑施工管理的思考[J].黑龙江科技信息,2008.
[3]王平平.浅议水利工程施工管理[J].中国水运,2007,(1).