论文部分内容阅读
在现代水利水电工程建设中,试验是质量控制的关键环节之一,一般情况下试验结果直接关系到人民的生命财产安全,其次这也是检查工程质量优劣最重要和客观的依据。所谓工程质量的优劣是指通过软件的检测系统与精密的试验手段,整理出科学的数据,以此为据对工程作出全面的评价。并且根据试验检测数据对工程施工过程中的各个环节及生产成品的强度等进行细致地控制,以确保工程整体的质量。试验数据是水利水电试验工程能否通过验收和结算的重要步骤,也是工程监理对工程施工质量实施有效控制的重要手段。该文总结了水利水电工程试验的影响因素和施工技术,期望可以帮助工作人员更好地开展水利水电试验工作。
In the construction of modern water conservancy and hydropower projects, the test is one of the key aspects of quality control. Under normal circumstances, the test results are directly related to people’s life and property safety. Second, this is also the most important and objective basis for checking the quality of construction projects. The so-called the pros and cons of project quality refers to the software testing system and sophisticated test methods, sorting out the scientific data, based on which to make a comprehensive assessment of the project. And according to the test data to test the construction process in all aspects and the strength of the finished product and other detailed control to ensure the overall quality of the project. The test data is an important step for whether the water conservancy and hydropower project can pass the inspection and settlement and is also an important means for the project supervisor to effectively control the project construction quality. This paper summarizes the influencing factors and construction techniques of water conservancy and hydropower engineering test, expecting to help staff to carry out the test of water conservancy and hydropower better.