皖能马鞍山发电有限公司(以下简称公司)“上大压小”扩建工程采用EPC总承包的建设模式,委托中国电力建设工程咨询公司和中国电力顾问集团中南电力设计院联合体进行工程的设计、采购、施工和调试总承包,属“交钥匙”工程。工程开工以来,公司对EPC总承包建设模式的认识,从一般的概念理解,逐步体会到其本质内涵。EPC总承包管理的优势有效控制工程造价。EPC总承包的方式是把设计
Anhui Wanneng Maanshan Power Generation Co., Ltd. (hereinafter referred to as the Company) and “Shanggao Xiaobu” expansion project adopted the construction mode of EPC general contracting and entrusted China Light and Power Construction Engineering Consulting Corporation and China Southern Electric Power Design Institute Consortium to carry out the project Design, procurement, construction and commissioning general contractor, is a “turnkey” project. Since the project started, the company’s EPC general contracting construction mode of understanding, from the general concept of understanding, and gradually understand its essence. The advantages of EPC general contracting management effectively control the project cost. The EPC EPC approach is to design