论文部分内容阅读
我们听了林主任、李总工程师和苏联专家组长的报告,以及参加了小组讨论以后,感到长办在前一阶段做了很多工作,贯彻了毛主席所提出的“积极准备,充分可靠”的方针,对三峡枢纽这一举世瞩目的伟大工程,做出了具有充分论证和比较切合实际的初步设计要点,我们参加了这次讨论会,也学习到很多知识。现在就坝区坝段选择等几个问题,提出我们的一些看法,供长办研究参考。(一)关于坝区坝段选择我们认为枢纽修建在三斗坪是正确合理的,无论在地质条件、水工建筑物布置、施工的便利、工
After listening to the reports of Director Lin, Chief Engineer Li and the Soviet experts, as well as attending the panel discussion, we felt that Changban has done a great deal of work in the previous phase and implemented Chairman Mao’s “positive preparation, full and reliable” We have made preliminary design points that are fully demonstrated and more realistic. We participated in this seminar and learned a great deal of knowledge. Now dam dam section selection and several other issues, put forward some of our views for long to do research and reference. (I) Selection of dam sections in dam area We think that the construction of the hub in Sandouping is correct and reasonable. No matter in geological conditions, layout of hydraulic structures, construction convenience, labor