如何处理钢铁渣,特别是钢渣,已成为当前钢铁工业急待解决的一个迫切问题.成都钢铁厂地处川西平原,年排钢渣万余吨,占地十余亩,与农业争地,矛盾十分尖锐.1979年12月至1980年1月,我们在成钢100米~3高炉进行了电炉氧化期干渣直接加入高炉冶炼的试验,取得了降低原燃料消耗和生铁成本、提高生铁质量等予期效果,为解决钢渣出路、化害为利、变废为宝找到了一条可行途径.成钢已将钢渣正式作为高炉原料使用.一、电炉钢渣性能电弧炉钢渣分为氧化渣和还原渣两部
How to deal with steel slag, especially steel slag, has become an urgent problem to be solved urgently in the steel industry.Chengdu Steel Plant is located in the western Sichuan Plain, with tons of tons of slag per year, occupying an area of more than ten mu and contradicting with agriculture Sharp December 1979 to January 1980, we conducted in the blast furnace 100 ~ 3 blast furnace oxidation furnace slag directly into the blast furnace smelting test, achieved a reduction in raw material consumption and pig iron costs, improve the quality of pig iron and other pre- Effect, in order to solve the slag out of the way, for the benefit of harm, turning waste into treasure to find a viable way .Steel steel slag has been formally used as a raw material .A, the performance of electric furnace slag arc furnace slag is divided into two parts