我矿井下分3个生产采区,各采区煤炭的运输方式均为架线式电机车牵引3 t矿车(简称列车)运输。同时,各采区的矸石、材料、设备与人员等运输也均由井下运行的18列列车(由电机车和1 t矿车或平巷人车组成)来运输。 该矿具有50余年的开采历史,井下双道运输大巷共计12000 m,大巷运输始终采用原设计的列车运输方式,设备和线路基本上没有进行过大的技术改造。 近些年来,随着煤矿体制的改革,矿井产量的提高,生产经营方式的改变,使得一些不适应煤矿生产和经营的因素突出显现出来。因此,进行技术改造是十分必要的。 1存在的问题 该矿目前使用的架线式电机车基本上都是1997年以前的产品,其受电器结构为弹性机械结构,直接与架空线接触的是碳素滑板。经过长期使用,受电器装置存在以下问题。
I mine sub-3 production mining area, the mining area of coal transport are wire electric traction 3t tub (referred to as train) transport. At the same time, the transportation of gangue, materials, equipment and personnel in each mining area is also transported by 18 trains running underground (consisting of electric locomotives and 1 t mine car or lane car). The mine has a history of more than 50 years of mining, underground double-lane transport a total of 12,000 m, the main road transport has always been the original design of train transport, equipment and wiring basically no major technological transformation. In recent years, along with the reform of the coal mine system, the increase of the mine output and the change of the mode of production and operation, some factors that are not suitable for the production and operation of coal mines are highlighted. Therefore, technological innovation is necessary. 1 existing problems The mine is currently used in wire electric locomotive are basically all products before 1997, the electrical structure of its flexible mechanical structure, the direct contact with the overhead line is a carbon skateboard. After long-term use, the following problems with the electrical device.