论文部分内容阅读
“虚位计划”是相对于“空位计划”而言的。传统的“空位计划”是指对物理层面上属于空置状态的堆场场位或船舶舱位进行计划,与之相反,“虚位计划”是指对物理层面上属于被占用状态的堆场场位或船舶舱位进行计划;“虚箱计划”是相对于“实箱计划”而言的,是指对物理层面上属于非在场状态的集装箱进行计划。 在系统开发过程中,独辟蹊径,往往事半功倍。在实现“虚位计划”和“虚箱计划”的功能时,设计人员便是匠心独具地运用了英语语法中的“时态”概念,使看起来与操作管理系统设计风牛马不相及的二者巧妙地结合了起来。
The “dummy plan” is relative to the “space plan” in terms of. The traditional “vacancy plan” refers to the physical level is empty on the yard site or ship accommodation planning, on the contrary, “phantom plan” refers to the physical level is occupied by the state of the yard site Or vessel class; “Virtual Box Program” is relative to “Box Program” and refers to the planning of containers on the physical level that are not present. In the system development process, creative, often with less effort. When implementing the functions of the “virtual plan” and the “virtual box plan,” designers are using the concept of “tense” in English grammar with all their heart and soul, making it appear incompatible with the operational management system design style The two are cleverly combined.