论文部分内容阅读
水中倒土筑坝是一种多、快、好、省的先进施工方法,它是利用土料浸水后湿润散化,造成有利的压实条件,然后在运土人工和机具以及坝体自重的作用下逐渐得到密实。这种施工方法是从苏联发展起来的,并在技术理论上做了很多试验研究工作。我国近一、二年来也有不少省相继采用了这一施工方法证明它有很多优点:不需要碾压设备,施工速度比较快,受气候影响也较小,只要严格执行施工操作规程,可以保证工程质量,简易经济,很适合我国大跃进形势的要求。我省在1958年冬组织各专、市代表去山西省参观学习后,即在太湖县罗山水库、凤阳燃灯水库、肥西县龙潭岩水库、颖上县临淮岗水库、定远县
Inverted earth dam in water is a kind of advanced construction method which is more, faster, better, and more economical. It is made by wetting and digesting soil after soaking in water, resulting in favorable compaction conditions. Then, Under the action gradually get dense. This construction method was developed from the Soviet Union, and in the technical theory has done a lot of experimental research. In the recent one or two years in our country, many provinces have successively adopted this construction method to prove that it has many advantages: no roller compaction equipment is required, the construction speed is relatively fast, and the influence by the climate is also small. As long as strict implementation of the construction operation rules can ensure Project quality, simple economy, it is suitable for the situation of the Great Leap Forward in China. In the winter of 1958, our province organized various specialties and city representatives to visit and study in Shanxi Province, namely, Luoshan Reservoir in Taihu County, Fengyang Light Lamp Reservoir, Longtanyan Reservoir in Feixi County, Linhuaigang Reservoir in Yingxian County, Dingyuan county