运城市位于山西省南端,新中国成立后,国家沿黄河、汾河相继建成了夹马口、大禹渡等高扬程提水泵站灌区22处,控制面积24.6万.hm2,占该市水地面积的58%。22处泵站平均扬程达120m,大禹渡二级枢纽站单级扬程高达198.2m;尊村灌区规模10级28站,提水流量46.5m3/s。这些工程的建成,极大地改变了该市的农业生产条件,
Yuncheng City is located at the southern tip of Shanxi Province. After the founding of new China, the country along the Yellow River and the Fen River have built Jiamakou, Dayudu other high lift pumping station irrigated 22, control area 246000. Hm2, accounting for the city water 58% of the area. The average lift of 22 pump stations reached 120m, the single-stage lift of Dayudu 2nd-level junction station reached 198.2m, and the size of Zuncun Irrigation Area was 28 stations of Grade 10 with a water lift of 46.5m3 / s. The completion of these projects has greatly changed the city’s agricultural production conditions,