论文部分内容阅读
限额设计是设计阶段工程造价控制的关键环节,在可研、初设、施工图设计各阶段,对工程造价的影响程度都不同。本文结合水利工程的特点,对水利工程如何实施限额设计进行探讨。
The design of quotas is the key link of project cost control in the design stage. The influence on project cost is different in all stages of feasibility study, preliminary design and construction drawing design. Based on the characteristics of water conservancy projects, this paper discusses how to implement quota design in water conservancy projects.