近年来,我国电力工业决定建设一批2000年燃煤示范电厂,示范电厂设计总体思路是:在安全可靠的前提下,缩短建设工期,降低工程造价,降低上网电价,争取更大的经济效益。这是落实“知识创新、制度创新、管理创新”的具体体现。火电厂设计从“七五”末期到“八五”期间共历经了火电
In recent years, China’s power industry has decided to build a number of coal-fired demonstration power plants in 2000. The overall design of the demonstration power plant is based on the premise of safety and reliability: shorten the construction period, reduce the project cost, reduce the on-grid tariff, and strive for greater economic benefits. This is a concrete embodiment of the implementation of “knowledge innovation, institutional innovation, management innovation”. The thermal power plant design has experienced thermal power from the end of the 7th Five-Year Plan to the 8th Five-Year Plan.