20 0 0年 9月武钢同奥钢联签订了烧结厂自动化包 (二级自动化和过程优化 )供货合同 ,包括一套工艺信息系统和多个在线工艺模型。其关键特点是生产率提高 3%~ 5 %、焦炭消耗减少 2 %以上、系统作业率超过 99.5 %。系统于 2 0 0 1年 4月 (合同开始执行后仅 7个月 )投入运行。介绍了所安装的模块以及在武钢一烧结运行初期取得的结果
September 20, 2006 WISCO signed a supply contract for the sintering plant automation package (two-stage automation and process optimization) with the Austrian Steel Group, including a process information system and several online process models. The key features are 3% to 5% increase in productivity, 2% reduction in coke consumption, and a system operating rate of over 99.5%. The system was put into operation in April 2001 (only 7 months after the commencement of the contract). Describes the modules installed and the results obtained during the first sintering run of WISCO