本文通过上海两幢高层建筑现浇楼板荷载传递的现场测试,对高层建筑现浇楼板施工中如何合理确定支模层数的问题,进行了分析研究。并以实际工程为例,计算出支模层数。
In this paper, the field test of load transfer of cast-in-place floor slabs in two high-rise buildings in Shanghai is carried out to analyze how to reasonably determine the number of mold layers in the cast-in-situ slab construction of high-rise buildings. Taking the actual project as an example, the number of mold layers is calculated.