丹江口水库被选为第一期工程来解决汉江的防洪、灌溉、发电、航运等任务及解决长江部份防洪任务,已在汉江流域规划报告及长江流域规划要点报告中得到全面的论证。本文仅系汇集丹江口水库建成后初期运转的蓄水量保证率曲线的绘制,并据此以求出水库逐年动能指标的具体计算方法以及一些原则问题的处理等方面加以整理而成。由于计算中考虑的问题繁多,采用的方法多系在工作中摸索而得,是不够成熟的。但因此类工作,正在大量展开,故撰成此文,供进一步深入研究的参考。限于笔者水平,不当之处,希读者教正。当水库有效库容与其所调节的正常迳流量相对地较大时,则水库的充蓄将较为缓慢。这样就必然影响到水库初期运转时的各种动能指标。尤其是开
Danjiangkou Reservoir was selected as the first phase of the project to solve the Han River flood control, irrigation, power generation, shipping and other tasks and to solve some of the Yangtze River flood control tasks, has been in the Han River Basin Planning Report and the Yangtze River Basin Planning Point Report was fully demonstrated. This article only draws the drawing of the curve of the water storage volume guarantee rate after the initial operation of Danjiangkou reservoir is completed. Based on this, it calculates the annual calculation of the kinetic energy index of the reservoir and the treatment of some principle problems. Due to the large number of problems considered in the calculation, the methods adopted are mostly based on the work and are not mature enough. However, because of this kind of work, it is being carried out in large numbers, so it is a reference for further research. Limited to the author level, inappropriate, hope readers correct. When the effective storage capacity of the reservoir is relatively larger than its normal flow regulation, reservoir recharge will be slower. This will inevitably affect the initial operation of the reservoir when a variety of kinetic energy indicators. Especially open