论文部分内容阅读
由于地块开发的时序不同,为避免对路面的破坏或污染,同时提高政府财政资金的利用率,目前不少片区内的道路都采用路面分期实施的办法,沥青砼顶面层往往在周边开发建设基本完成后再进行完善,但在实施时现状道路往往会出现不少病害,因此需对病害先进行处理再实施罩面。本文结合实际工程案例,对沥青砼路面的完善设计进行总结探讨,分析路面病害的主要成因,并对病害进行相应处理,采取必要的措施,确保路面的强度和服务水平,为类似的工程提供参考。
Due to the different timing of the plot development, in order to avoid the destruction or pollution of the pavement and improve the utilization rate of government financial funds, many roads in the area adopt the method of road surface staging, and the top layer of asphalt concrete is often developed in the periphery After the construction is basically completed, it will be perfected. However, the present status quo of the status quo often shows many diseases when implemented. Therefore, it is necessary to deal with the disease first and then implement the oversight. In this paper, the actual engineering case, the perfect design of asphalt concrete pavement to summarize the analysis of the main causes of pavement disease and disease treatment, take the necessary measures to ensure the strength of the road and service levels for similar projects provide a reference .