葛洲坝大江电厂基岩强透水带的封堵和深孔固结灌浆

来源 :水力发电 | 被引量 : 0次 | 上传用户:chaoyuemengxiang2009
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
(一) 地质概况葛洲坝大江电厂基岩中的强透水带, 由F_(116)、F_(114)、F_(126)等6条缓倾角逆断层和CF_(001)、CF_(002)层间错动溶蚀面组成,呈近南北向展布。其北端通过大江上游围堰,伸入水库内,南端延伸到大江电厂17~21号机处。在这些机组范 (I) Geological Survey The strong permeable belt in the bedrock of the Gezhouba Dajiang Power Plant is composed of six gently-inclined thrust faults (F 116, F 114 and F 126) and the CF 001 and CF 00 layers Misgurnal erosion surface composition, was nearly north-south distribution. Its northern end through the cofferdam of the upper reaches of the Yangtze River, into the reservoir, extending to the southern tip of Dajiang Power Plant No. 17 to 21 Office. Fan in these units
其他文献
再归因训练是目前归因研究的重要领域,作者尝试针对本三院校英语专业学生探索并构建再归因训练模式,并对此开展实验研究以期获得科学的训练模式。 Attribution training is
It is a very difficult problem to directly determine fluid pressure during hydrocarbon migration and accumulation in sedimentary basins. pVt modeling of cou
家具价格离不离谱在中国海关信息咨询中心查阅了“1995年1—6月全国进口商品表”,其中,用号称木材至尊的红木制成的卧房用家具,上半年的进口总额为213564美元,进口总件是553件,平均每件386美元。一套
蚌埠市价格调节基金制度取得显著成效1993年9月,蚌埠市开始在旅店业征收价格调节基金。1994年3月建立了价格调节基金制度。1995年6月以来,根据征收工作的实际情况,又对价格调节基金制度进行了几
为识别含水层参数 ,本文在十进制简单遗传算法 (SGA)的基础上 ,提出了一种改进的组合方法 ,即优体克隆 +子体优生遗传算法 (BCC YGCD GA)。理想模型计算表明 ,与SGA比较 ,BCC
一、概述丰满大坝基础存在较大的断层破碎带,日伪施工时,处理不彻底,影响大坝安全运行。最近地震烈度又提高一度,坝基抗滑稳定安全系数远小于规范要求值,急需加固处理。经比
利用价值工程中的一些基本原则和方法对产品进行经济效益分析,提出的改进方案能改善产品的功能,降低生产成本。 The use of value engineering in some of the basic princi
一、工程概况大黑汀水库枢纽工程是引滦工程的渠首工程,包括溢流坝、重力坝、泄洪底孔、电站及渠首引水涵洞等建筑物。其中溢流坝共设28孔闸门,每孔净宽15米,墩厚3米,一个坝
礼貌是东西方普遍存在的现象,对礼貌的语用研究是当前语言学研究的热点之一。对礼貌机制的阐释,最为盛名的有Leech“礼貌原则”(Politeness Principle)和Brown&Levinson的“
一、概述龙羊峡水电站位于青海省黄河上游,是我国目前正在施工的大型水电工程。该工程的河床部分采用混凝土重力拱坝,最大坝高178米,共分18个坝段。右岸11号坝段内布置有底