根据贵阳~新寨高等级公路第三合同段红粘土特性与试验结果,进行填筑试验段施工,分析试验过程和结果,确定合理的施工参数指导红粘土用于路基90区填筑施工。
According to the characteristics and test results of the red clay in the third contract section of Guiyang-Xinzhai high-grade highway, the construction of the filling test section is carried out. The test process and results are analyzed to determine the reasonable construction parameters to guide the red clay for the filling construction of the 90 subgrade.