【摘 要】
:
阐述了瀑布沟水电站工程在办理175项单项工程竣工结算时遇到了工程量计量依据不足,工程变更的依据不足,提交的竣工结算资料不能满足计算竣工结算量、价审核的需要;有经验的技
论文部分内容阅读
阐述了瀑布沟水电站工程在办理175项单项工程竣工结算时遇到了工程量计量依据不足,工程变更的依据不足,提交的竣工结算资料不能满足计算竣工结算量、价审核的需要;有经验的技术管理人员不足等问题,针对经常遇到的问题,提出了解决的方法,从而在工程投资控制中取得了预期效果,并指出内部审核可以进一步加强投资控制。
It expounds that Pubugou hydropower project encountered insufficient basis of engineering quantity measurement, lack of basis for project alteration when submitted for settlement of 175 individual projects, and submitted completion settlement data can not meet the need of calculation of settlement volume and price. Experienced technology Lack of management personnel and other issues. In view of the frequently encountered problems, a solution is put forward to achieve the expected results in the project investment control. It points out that the internal audit can further strengthen the investment control.
其他文献
将EDA(电子设计自动化系统)及ATPG(自动测试图形产生)工具与ATE(自动测试设备)集成在一起,使得I_(DDQ)测试更为实用。
Integrating EDA (Electronic Design Automation Syst
“造林工程”,至少要比一般植树造林的规模要大,目标更为明确,质量要求也更高和具体,有一整套调查规划设计。而且作为一项工程任务来完成,则要纳入国家或地方计划。在新疆干
During tomb sweeping day this year there was overchargingof funeral and internment articles,and market disorder oc-curred in the funeral and internment busines
本标准适用于天然林和人工林生漆采割的技术操作规程。 1 开割树龄根据主杆树皮裂纹(花子)程度确定,主杆分枝点以下树皮全部呈现裂纹,裂口四周外表皮开始出现死皮层翘起或脱
苗木移植时,由于部分根系被截断,根部吸收水分和无机盐的能力大大削弱,不能满足原有枝叶对水分和无机盐的需求,所以在移植时必须对枝叶进行适当的修剪,以节制水分蒸发和营养
塞罕坝是个大型人工林林场,是我省落叶松人工林生产基地。目前大面积人工用材林均已郁闭,林场的任务由造林为主转入了全面经营为主。近年来,林业科技人员对林场各种经营措施
“两三岁孩子不认字就像两三岁孩子不会说话一样,不正常;六七岁孩子入小学才开始识字,就像六七岁孩子上小学才开始学说话一样,不正常。”这是北京国际汉字研究会根据国内外文
青岛确定为国际城市是根据自身所具有的优势 ,即具有世界上少有的优良港口资源和地理区位势 ,可持续发展为国际航运中心
Qingdao is defined as an international city base
宝钢马迹山港东山开挖,在施工环境十分复杂的情况下采用了控制爆破施工技术,取得良好的工程效果。文中介绍了控制爆破各技术参数的选取和施工防护措施。
Baosteel Majishan
Objectives: The purpose of this study was to characterize the occurrence of phrenic nerve injury(PNI) and its outcome after radiofrequency(RF) ablation of atria