论文部分内容阅读
随着社会主义建设的飞速发展,对有色冶金设备及操作的机械化、自动化提出了更高的要求。我厂铅阳极铸型作业,1965年将手工操作改为半手工半机械化操作,即用一个车臂的半圆回转吊来代替手工捞板,而起模、浇铸、浇水、除毛刺等操作仍由手工完成;生产出的阳极板不平直,给电解操作带来不利,且铅板产出后是由38片吊拚在一起,上槽前还需人工排板。这些操作体力劳
With the rapid development of socialist construction, higher requirements are put forward on the mechanization and automation of non-ferrous metallurgy equipment and operations. I plant the anode anode mold operation, in 1965 the manual operation to semi-manual semi-mechanized operation, that is, with a car arm semicircular rotary crane instead of manual fishing plate, and mold, casting, watering, deburring and other operations are still By hand to complete; produced anode plate is not straight, to bring adverse to the electrolysis operation, and the lead plate output by the 38 hanging spell together, on the tank before the need artificial row plate. These operators work hard