外墙面封堵施工方法

来源 :建筑工人 | 被引量 : 0次 | 上传用户:ZuoLuo
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一个工程施工质量的好坏,很大一部分取决于防治渗漏质量通病的控制,而外墙面渗水,逐渐成为业主关注的重点。笔者根据工程施工经验就地上与地下外墙面施工封堵方法进行总结,希望对地上与地下外墙面封堵施工有一定帮助。一、地上结构外墙面封堵地上结构外立面剪力墙、柱模板安装穿墙对拉螺栓孔洞的堵塞可采取如下方法。(1)使用锥形塑料垫块(喇叭形胶圈)和PVC-U套管的对拉螺栓,先剔除对拉螺 A project construction quality is good or bad, a large part depends on the prevention and treatment of common problems of leakage quality control, and the external wall seepage, has gradually become the focus of the owners. According to the construction experience, the author summarizes the construction and sealing methods of on-site and off-site external wall construction, hoping to help the construction of the block on the ground and underground walls. First, the ground structure of the outer wall of the block wall structure of the ground shear wall, column template installed through the wall bolt pull bolt hole can be taken as follows. (1) Use a tapered plastic spacer (horn apron) and PVC-U casing of the pull-bolt, remove the first screw
其他文献
毫无疑问,每年的暑期档,除了充斥着各种好莱坞电影外,就是各大游戏公司发布的各类新游戏了。至少对热衷于游戏的玩家而言,除去能够刺激肾上腺素分泌的火爆大片之外,也就只有场景与电影相比有过之而无不及的3D游戏才有类似的功效了。比较有趣的现象是目前的主流游戏市场呈现的是一种融合的趋势,以往泾渭分明的游戏机市场和PC游戏市场正在逐渐融合,而二者共同的“敌人”则是新兴的“移动游戏”市场。iOS也好,Andro
期刊
随着我国职业教育课程改革的逐步深入和对课程问题研究的高度关注,课程领导策略也越来越受到人们的关注。职业学校的课程领导应该采取何种策略?笔者现结合自己的实际,来谈谈这一问题。    一、构建新型的课程领导组织    1.新型课程领导组织是一种扁平式专业(团队)控制型结构  新型课程领导组织是一种扁平式专业(团队)控制型结构。扁平式专业(团队)控制型结构,最多层级为三级,实行线形专业管理结构;最高层级