论文部分内容阅读
本文原载于江西省水利电力厅水文气象局編印的:“1963年水文气象工作会議文件选集”,本刊在轉载时略有刪节。由于此“测洪方案編制办法”的闡述部分及所举实例此较具体,因而对于其他地区可能还不够成熟,仅供参考。
This article was originally published in the Hydrological Bureau of Water Resources and Hydropower Bureau of Jiangxi Province: “Selected Works of Hydrological and Meteorological Work Conferences in 1963”. The publication was slightly abridged. Due to the elaboration of this “flood measurement planning approach” and the examples cited are more specific, it may not be mature enough for other regions for reference purposes only.