三峡地下电站水轮发电机推力轴承安装与调整

来源 :东方电机 | 被引量 : 0次 | 上传用户:aghdks
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
本文以东方电机有限公司为三峡地下电站提供的700MW混流式立轴半伞式水轮发电机组推力轴承安装与温差调整为例,在解析机组推力轴承装配设计原理、特点、安装过程的基础上,详细阐述了机组试运行过程中推力瓦温差调整的全过程,探索弹簧束支撑结构推力瓦温差存在的原因,同时给出相应的调整方案。调整完成后,推力瓦温差达到三峡电站精品机组要求的2.5K以下,机组运行稳定。 In this paper, Dongfang Electrical Machinery Co., Ltd. for the Three Gorges underground power station 700MW Francis vertical shaft half umbrella turbine unit thrust bearing installation and temperature adjustment as an example, the unit thrust bearing assembly design principles, characteristics, the installation process based on the details The whole process of adjusting the temperature difference of the thrust bush in the process of unit commissioning is expounded, and the reasons for the existence of the temperature difference of the thrust bush of the spring support structure are explored. At the same time, the corresponding adjustment schemes are given. After the adjustment is completed, the temperature difference of the thrust tile reaches 2.5K below that required by the Three Gorges Power Station’s high-quality unit, and the operation of the unit is stable.
其他文献
不久前认识了Ted。他在上海工作了两年多,现在回到了纳什维尔,想继续学中文。于是我们开始相互学习中文和英文。他的中文说得真不错,对中国既熟悉又友好。在一次聚会时,他说