当前,老矿井的基本建设、挖潜改造(技术改造)和技术措施工程,无论在理论上还是在实际中都没有明确的概念。加之近些年来,资金渠道增多,各项费用的使用范围又缺乏严密的规定,因而在实际工作中常常扩大了维持简单生产,即更新改造资金的使用范围。一部分属于基本建设的工程列入了技术改造,甚至技术措施
At present, the old mine’s basic construction, tapping the potential transformation (technical transformation) and technical measures of the project, no matter in theory or in practice, there is no clear concept. In addition, in recent years, there have been more channels of funds and a lack of strict rules on the scope of application of various fees. As a result, the actual scope of the use of funds for maintaining and simplifying production is often expanded. A part of the projects that belong to capital construction have been included in technological transformation and even technical measures