治水患除水害4次大规模加高培厚下游两岸临黄大堤,总长1371.2km,基本形成“上拦下排,两岸分滞”防洪工程体系和“拦、调、排、放、挖”的综合处理泥沙体系。70年伏秋大汛堤防不决口,扭转历史上“三年两决口,百年一改道”的险恶局面,战胜12次流量超10000m~3/s洪水(包括1958年
Flood control and water damage 4 large-scale increase and thickened Lower reaches of the Yellow River Provisional Yellow River embankment, a total length of 1371.2km, the basic formation of “under the bar on the next row, both sides of the stasis” “flood control system and” block, tune, row, release, Integrated treatment of sediment system. 70 years of volcano autumn dikes do not break the mouth, to reverse the history of “three years of two bucks, a hundred years of a change of road,” the sinister situation, defeated 12 times super-flow 10000m ~ 3 / s floods (including 1958