宝珠寺水电站是白龙江干流梯级开发规划中第二个梯级电站。库区国道212线三堆至中庙段受淹改线约70余km,改道工程由省林业勘察设计院设计,1986年通过方案审查,1987年批准初步设计,同年11月由省土木公司承包施工,1992年底一、二期工程竣工并交付使用,被评为优良工程。对线路方案、设计指导思想、突出的重点、采取的工程措施、控制投资的举措和施工图设计作了系统介绍。总结了施工“两制”管理、健全“质保体系”及库区公路设计特点。
Baozhusi Hydropower Station is the second cascade power plant in Bailongjiang cascade development plan. The area of 212 National Road from Sanmu to Zhongmiao was covered by about 70 km of diversion and rerouting lines. The diversion project was designed by the Provincial Forestry Investigation and Design Institute. In 1986, it passed the program review and the preliminary design was approved in 1987. In November of the same year, the provincial civil engineering contracted construction At the end of 1992, the first phase and the second phase of the project were completed and delivered to use and was rated as Excellent Project. The introduction of the line plan, the guiding ideology of design, the prominent points, the engineering measures taken, the measures for controlling investment and the design of construction drawings were introduced systematically. Summed up the construction “two systems” management, improve the “quality assurance system” and the design of the reservoir area highway.