论文部分内容阅读
工程项目监理中,其质量控制具有主要的地位和作用。水工金属结构项目监理首先应协助业主单位选择具有水工金属结构产品制造合格证,以及具有专门机械设备的金属结构制造厂作为承包商及其合包商,并及时审查、批准、核发设计单位的施工图纸及承包施工计划。其次是搞好构件的组装和焊接过程中的质量控制、钢结构安装过程中的质量控制,以及水工钢结构防腐过程中的质量控制。
Project supervision, the quality control has the main position and role. Hydraulic metal structure project supervision should first assist the owner to choose to have a hydraulic metal structure product manufacturing certificate, as well as a special mechanical equipment manufacturer of metal structures as a contractor and its contractors, and timely review, approval, issue of design units Construction drawings and contracting construction plans. The second is to do a good job in the assembly of components and welding quality control process, the quality control of steel structure installation process, as well as hydraulic steel structure of the anti-corrosion process quality control.