触电事故是建筑施工“四大”伤害之一。为了有效地控制和预防建筑施工现场临时用电事故的发生,更好地贯彻和执行《施工现场临时用电安全技术规范》(JGJ46-88)和《建筑施工安全检查评分标准》(JGJ 59-88),要把临时用电的管理作为施工管理的一项重要工作常抓不懈,具体作法如下。一、架空线路1.施工现场临时用电应由专人负责架设、维修、管理。电工必须经安全培训,考
Electric shock accidents are one of the “four major” injuries in construction. In order to effectively control and prevent the occurrence of temporary electricity accidents on the construction site, it is better to implement and implement the Technical Specifications for the Temporary Use of Electricity on the Construction Site (JGJ46-88) and the “Building Construction Safety Inspection Grading Standards” (JGJ 59- 88) The management of temporary electricity should be used as an important task in construction management. The specific practices are as follows. I. Overhead lines 1. Temporary electricity use on the construction site shall be responsible for erection, maintenance, and management by special personnel. Electricians must undergo safety training.