本文结合杭州富亿广场工程塔吊基础的设计施工具体方案与实施,针对塔吊桩基设计施工各阶段进行分析,结合现场的实际过程中出现的问题,阐述在塔吊基础桩基施工阶段的几个重点环节及经验处理。引言随着目前建筑市场的不断发展,大底盘上多个主楼的设计十分普遍且用地红线与基坑边的距离是越来越小,这就促使越来越多的施工单位将塔吊的位置布置到了基坑当中,本文就是针对采用钢构柱的塔
In this paper, Hangzhou Fu billion square tower project based on the design and construction of specific programs and implementation of tower crane for the design and construction of various stages of the analysis, combined with the scene of the actual problems in the process of construction of the tower crane foundation pile foundation during the construction of several key points Links and experience management. INTRODUCTION With the continuous development of the current construction market, the design of several main buildings on a large chassis is very common and the distance between the red line on the construction site and the foundation pit is getting smaller and smaller, which prompts more and more construction units to arrange the positions of the tower cranes Into the pit, this article is for the use of steel columns tower