会议对煤矿井下电气化的八点建议

来源 :煤矿机械与电气 | 被引量 : 0次 | 上传用户:zzzzzzvb
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
在1981年12月27日至31日召开的煤矿井下电气化学术交流会议上,与会代表对目前我国煤矿井下电气化的现状进行了广泛的讨论。代表们认为这些年来,我们虽然做了不少工作,但总的来说,井下电气化水平不高,问题不少,与煤炭工业的发展需要相比,差距较大。同志们认为有必要进一步加强领导,加速井下电气工作的进展。现将会议上讨论的问题,归纳成下列八点建议,供有关方面参考。 At the coal mine electrification academic exchange conference held from December 27 to 31, 1981, delegates discussed the present situation of underground electrification in coal mines in our country. The deputies believe that although we have done a lot of work over the years, generally speaking, the level of underground electrification is not high and there are many problems, which are quite different from the needs of the development of the coal industry. Comrades think it is necessary to further strengthen leadership and speed up the progress of underground electrical work. The issues discussed at the meeting are summarized in the following eight suggestions for reference by the parties concerned.
其他文献
目的:通过对我院2013年10月至2014年10月住院治疗的患者中眼外伤的病例进行统计与回顾性分析,探讨影响视力预后的相关因素及眼外伤评分(OTS)在患者终视力预后评估中的作用。 
肝移植是治疗原发性肝癌的有效手段,肝移植术后肿瘤复发影响其长期疗效,但目前临床治疗方法效果均不理想,免疫治疗可能成为新的治疗模式。 NK细胞(naturalkiller,NK)是机体天
研究目的: 通过分析广东省HIV感染者/AIDS患者HIV-1基因序列特征,确定基因亚型,了解我省随访及治疗人群中HIV-1各基因亚型的流行特点,基因亚型与传播途径的相关性,及对抗反转录
会议由中国金属学会采矿学术委员会矿山系统工程学组主持,于今年3月15~22日在湘潭大学召开。来自冶金、煤炭、建材、化工等系统45个单位的90多名代表出席,对以下三方面的10个
为了使我国煤炭工业的发展保持一个与国民经济发展速度相适应的速度,则加快矿井建设、缩短建井周期就是一项非常重要的关键问题。对此,本刊过去曾选登了数篇综述性文章,引起
我国市场经济体制下,各行各业的经济发展都是非常迅速猛的.工商管理学是我国市场经济体制下的一种特殊的经济管理类学科.由于我国经济的各行各业的发展迅速,既要求工商管理的
寿王坟铜矿矿石性质,随着开采向深部延伸而变得复杂。原矿品位低已使浮选指标难以改善。部份矿体含硫高,造成了精矿品位达不到要求。81年10月初,由于入选原矿含黄铁高,铜精
1982年3月20~25日,国家有色金属工业管理总局在广西平桂矿务局召开了全国冶金重点矿山锡选矿座谈会。参加会议的有云南、广西、广东、湖南和江西等省(区)冶金局(厅)、重点矿
石人沟露天铁矿生产规模为150万吨/年。用4米~3电铲装车,太脱拉(15吨)、贝拉斯(27吨)、T—20和北京牌(20吨)等四种类型的汽车运输。为了客观地反映和认识装运过程的规律,给
SGW—40T型(以下简称40T)可弯曲刮板输送机是矿用炮采,机采工作面和顺槽的主要输送设备。要求输送量大,坚固耐用,并适合于煤矿现代化生产。1972年以来,我厂已生产6328台,用