Interval Type-2 fuzzy position control of electro-hydraulic actuated robotic excavator

来源 :矿业科学技术(英文版) | 被引量 : 0次 | 上传用户:leec208
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
This paper deals with fuzzy intelligent position control of electro-hydraulic activated robotic excavator for the control of boom,arm and bucket axes.Intelligent control systems are required to overcome undesirable stick-slip motion,limit cycles and oscillations.Models of electro-hydraulic servo controlled front end loader excavators are highly nonlinear.The nonlinear model accounts for fluid flow rate of valve,pump hydraulics,and friction forces.The friction forces are modelled by Coulomb,viscous and Stribeck function.Interval Type-2 Fuzzy Logic Controller (IT2FLC) is used to study the time domain position responses of axes in the presence of external applied load.It has the ability to control the position of eachof the three axes with minimum actuator position errors.Models presented are accurate and study the dynamics of the actuator and load.To improve the transient behaviour of the robotic excavator,we eliminated jitter of the bucket movement in the presence of nonlinearities.
其他文献
34 samples of Ru Guan porcelain body and 50 samples of Jun Guan porcelain body (both kinds being in different body colors) were selected with the purpose of fin
研究工作基于分形理论,应用G-P算法,通过对常州某股份有限公司事故时间序列的分析,构建了n维相空间,并利用关联维数的基本原理,对事故时间序列进行了分形特征分析.研究结果表
将复杂网络理论应用于制造业中的产品族零部件关系领域,构建了产品族零部件关系网络.为进一步深入研究零部件关系网络,需要搜索零部件关系网络中的简单路径.提出了一种有向无
The drawbacks of common nonlinear Filtered-adaptive inverse control (AIC) method, such as the unreliability due to the change of delay time and the faultiness e
A kind of active vibration control method was presented based on active damping and optimization design for driving load of multibody system with quick startup
The removal efficiency of 4-chlorophenol by ozonation was studied, and the reaction mechanism and characteristic of ozonation of 4-chlorophenol were investigate
利用公交IC卡数据建立了估计公交系统OD矩阵的双层数学规划模型,上层问题为广义最小二乘模型,下层问题为以变分不等式表示的基于超路径的公交网络均衡配流模型.采用启发式算
为探究吕家坨井田地质构造格局,根据钻孔勘探资料,采用分形理论和趋势面分析方法,研究了井田7
Total or near-total fertilization failure after intracytoplasmic sperm injection (ICSI) is a rare event,but it occurs repeatedly because of sperm defects in act
In order to understand the behavior of ligninolytic enzyme production by white rot fungi Phanerochaetechrysosporium, study on time courses and a mathematical mo