天生港水道造床设计流量确定方法的探讨

来源 :江苏水利 | 被引量 : 0次 | 上传用户:underdog1234
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
长江南通河段天生港水道在潮流界范围以内,其流态受长江径流、潮流相互作用。汛期径流作用大,枯季潮流作用大。流量、水位、流速随时在变化,因此,在整治水道过程中,对造床设计流量如何确定,难度较大。既不能单纯地套用一般河道推求造床设计流量的方法,也不能应用潮波传递的方法。我们分析了长江南通河段近年水文实测资料,认为可以用 The natural course of the Nantong section of the Yangtze River is within the confines of the tidal current and its flow regime is affected by the runoff and tidal currents of the Yangtze. Large flood season runoff, the role of the trend of dry season. Flow, water level, flow rate at any time in the change, therefore, in the process of remediation waterway, how to determine the flow of bed design, more difficult. Neither can we simply apply the method of deducing the design flow of the bed for general river courses, nor can we apply the method of tidal wave transmission. We analyzed the hydrological data of the Nantong section of the Yangtze River in recent years and found that we can use it
其他文献
在过去的计划经济体制下,我国的所谓市场是卖方市场。如今,我国的经济是在市场经济体制下运行,国家已经取消大多数产品的调拨指令,我国的市场已从卖方市场转向买方市场。在
近些年来,随着中职学校招生规模的不断扩大,学生来源日趋复杂,校园伤害事故日益增多。从社会、学校、学生自身等方面对中职学校校园伤害事故的成因进行了较为深入的分析,并提
一、防洪是水利工程的一项重要任务洪水是破坏力很大的一种自然灾害,它可能造成人民生命财产的重大损失,影响国民经济的持续增长.广州市1915年大水,洪水位3.5米,受淹7天,按
1984年9月14日~19日,水科院、华中工学院受水电部科技司委托,在华中工学院召开了水轮机调速专业经验交流会议。参加会议的除有水电系统的科研、高校、设计、安装和运行单位外
进入信息时代,多媒体作为一种先进的教学手段,能够给学生提供一个良好的语言环境,也给现代教学带来了很大的变革,尤其是多媒体技术可以将大量的听、读、说、写等各项技能训练
一、概况南昌市地处赣、抚等河流尾闾,波阳湖畔。目前除南昌市区外,还管辖四个县(即南昌、新建、进贤、安义等县),全市共有耕地329.2万亩,其中水田269.9万亩。人口324.7万人
英语学习者应该充分认识英语学习的特点和规律,掌握英语学习的策略和方法并在实际的英语学习中加以应用并逐步改进,使之完善.英语教师应该把对学习策略研究纳入自己的教学工
利用超声波法测量水轮机效率虽然还没有得到国际电工委员会的承认,但它的应用却变得越来越普遍了。它的许多优点说明了这种测量方法的通俗性,并且还确认了这种测量方法的可重
江厦潮汐试验电站1、3号机是两台流道外形、转轮直径都相同的小容量灯泡式机组,其中1号机单机容量500千瓦(实际能发600千瓦),水轮机转速118转/分,是通过行星齿轮增速器将发
近几年来,水利工作开始重视经济研究了。这是可喜的现象。但研究一般偏重于技术经济,就工程论工程。即使在流域或地区规划中也仅是工程方案的经济比较。且局限于一定的时间