阿尔及利亚比林和平堆一、二期升级改造工程项目(简称B1/B2项目)是对中方于1987年援建的比林和平堆一期、二期核设施进行升级改造。和平堆为多用途重水研究堆,热功率15 MW。该工程始于1987年,1992年7月达到额定功率。当前,和平堆及辅助设施已经运行了20 a,部分系统、部件和设备面临老化陈旧问题。为此,需要对反应堆及其辅助系统进行适应性升级改造。仪控室承担了B1/B2项目仪控系统的绝大部
The Alimony Bering Hepingdui Phase I and II Upgrading Project (B1 / B2 Project) is an upgrade of the Phase I and Phase II nuclear facilities of Bering Hepingdui, which was aided by China in 1987. Peace reactor for multipurpose heavy water research reactor, thermal power 15 MW. The project started in 1987 and reached its rated power in July 1992. Currently, Heping Heap and auxiliary facilities have been in operation for 20 years and some of the systems, components and equipment are facing aging obsolescence. To this end, the reactor and its auxiliary systems need to be adapted and upgraded. Instrument control room commitment B1 / B2 project most of the instrument control system