北仑港矿石中转码头,是宝钢工程重要配套项目之一。年吞吐能力为二千万吨。其整套装卸设备是从日本国日立制作所引进的。合同于1978年11月25日正式签订。引进的成套设备包括:1.卸船机2台(公称能力2100吨/时,最大能力2650吨/时);2.装船机2台(公称能力4200吨/时,最
Beilun Port ore transit terminal, Baosteel project is one of the important supporting projects. Annual handling capacity of 20 million tons. Its entire handling equipment was introduced from Hitachi, Japan. The contract was signed on November 25, 1978. The introduction of complete sets of equipment include: 1. Unloader 2 (nominal capacity of 2100 tons / hour, the maximum capacity of 2650 tons / hour); 2 loading machine 2 (nominal capacity of 4200 tons / hour, the most