1995年6月,美国陆军工程兵团向美国国会递交了历经18个月,耗资180万美元的报告:《泛区管理评估》。这是美国政府针对1993年特大洪水发表了几份重要报告之后,关于防洪治理对策研究的又一应对之作。这份报告以419页的篇幅、精细的计算、翔实的资料、充分的论据和鲜明的结论,阐明了美国江河与泛区防洪工程与非工程措施在1993年大洪水中的作用及存在问题。该报告的重要特色是对各类
In June 1995, the U.S. Army Corps of Engineers submitted a report to the U.S. Congress covering 18 months at a cost of $ 1.8 million: “Pan-management assessment.” This is yet another response made by the U.S. government to the study on countermeasures against flood control after several major reports on the 1993 extraordinary flood. The report uses 419 pages, elaborate calculations, detailed data, sufficient arguments and clear conclusions to clarify the role and existing problems of U.S. flood and flood control and non-engineering measures in the Great Flood in 1993. The key feature of this report is for all types