摘要:随着对烧结粘土砖的限制使用和一系列的建筑节能标准的行政措施出台,各种轻质材料如混凝土,灰砂等小型砌块充斥着建筑材料市场。特别是应用在多层框架和框架剪力墙结构体系的填充墙体中,但随之也会产生墙体开裂、渗漏等质量通病问题,本文主要针对其裂缝问题进行分析并指出防治措施。
关键词:裂缝;原因分析;防治措施。
Abstract:With the introduction of restrictions on the use of sintered clay brick and a series of building energy efficiency standards for administrative measures, a variety of lightweight materials such as concrete, lime sand and small block filled with construction materials market. In particular, application framework and the framework of multi-storey shear wall structural system filled wall, but there will also have the problem of quality defects such as wall cracks, leakage, this paper, analysis and pointed out that the control measures for the crack problem.
Key words: crack; cause analysis; control measures.
中图分类号:TU5 文献标识码: A文章编号:2095-2104(2012)
1.砌块的质量问题及防治措施
(1)设计规定不能使用未达到龄期的砌块,但由于施工工期紧,砌块供不应求,部分砌块在未达到龄期时便已进场使用,并且很难测量砌块龄期。轻质混凝土砌块干缩变形很大,28天以内收缩变形值比28 天后大几倍。在龄期达到28 天前,其自身收缩较为明显,可达0.37mm/m,占最终收缩值的60%以上,随着强度的增加,它的收缩变形将越来越小。因此,为了保证砌体的强度,应使用达到强度的砌块。砌块的收缩变形会使墙体产生竖直裂缝,阶梯形裂缝、窗台边斜裂缝、框架柱与填充墙之间的裂缝。
(2)材料进场时应按不同品种,不同规格,不同批号分别堆放,避免施工时将不同规格的砌块混砌。因规格不同的砌块干密度不同,若混砌于同一道墙上会因砌块的含水率不同在墙体中出现不规则的裂缝。另外,墙体每日砌筑高度不能超过1.8m ,避免砌体沉缩变形过大。
2.设计不足产生的裂缝及防治措施
由于对新型材料的认识不足,在设计方面没有针对性预防措施和技术交底措施,且建筑物不均匀沉降,引起建筑物墙体结构内的附加应力,这是导致墙体产生剪拉斜向开裂或垂直弯曲开裂的主要原因。因此在实际施工中,会存在以下问题:
(1)门窗洞及预留洞边等部位的应力集中区,无采取有效的拉结加强措施时,由于撞击振动而容易开裂,因此在门窗洞口应布置适量的拉结筋保证其强度;
(2)后砌填充围护结构当墙体的尺寸与砌块规格不配时,难以用砌块完全填满,造成砌体与混凝土框架结构的连接部位孔隙过大而容易开裂,此时应采用粘土砖或用砂浆填满空隙;
(3)墙面开洞、安装管线等引起墙体变形而开裂,在砌墙时应预埋管线和预留洞口;
(4)墙厚度过小及砌筑砂浆强度过低,使墙体刚度不足也容易开裂,应采用符合强度要求的砂浆。
3.砌筑的施工问题及防治措施
(1)砌块在砌筑时应错缝搭砌,避免产生竖向裂缝。砌块与红砖不同,可以随意砍凿,因此在砌筑前应根据砌块的尺寸,认真编制排列图和设计皮数杆。基本原则是,砌块上下皮应错缝砌筑,搭接长度不宜小于块长的 1/3,个别条件下小砌块的搭接长度不应小于 90mm;竖向通缝不应大于 2 皮砌块,多孔砖应一顺一丁砌筑,并尽量避免设计宽度小于600mm 的窗间墙。
(2)砌块在砌筑时灰缝的宽度和砂浆饱满度应符合要求,避免因粘结力和强度不足产生裂缝,具体做法为:烧结空心砖、轻骨料混凝土小型空心砌块砌筑时,砖孔沿水平方向砌筑,要保证灰缝砂浆饱满,竖向缝砂浆应嵌进缝内深度不小于 15mm;每砌两皮砌块用原浆勾缝,水平灰缝和竖向灰缝宽度均应控制在 8~12mm;蒸压加气混凝土砌块宜用专用砂浆砌筑,水平和竖向灰缝宽度宜分别控制为 15mm 和 20mm。灰缝过厚和过宽,不仅浪费砂浆,而且灰缝的收缩也不利于砌体裂缝的控制,砌体灰缝饱满度均应不小于 80%。
(3)墙体中宽度大于 300mm 的预留洞口应设钢筋混凝土过梁,且伸入每边墙体的长度不应小于 250mm。
4.温差作用的原因
混凝土砌块墙体对温度的敏感性比砖砌体高,很容易受温度变化引起变形导致墙体开裂,溫度裂缝是造成墙体早期裂缝的主要原因。最常见的温度裂缝出现在混凝土平屋盖房屋的顶层两端墙体和山墙上。如在门窗洞边的正“八”斜裂缝、山墙上部的斜裂缝、平顶下或屋顶圈梁下沿砌块灰缝的水平裂缝、以及水平包角裂缝等。这些裂缝一般经过一处冬夏之后才逐渐稳定,不再继续发展,裂缝的宽度随着温度变化而略有变化。温度裂缝有明显的规律性;两端重中间轻,顶层重往下轻,阳面重阴面轻。因此在施工时应留置一定数量的预留缝,满足因温差引起的伸缩变形。
5.填充墙与框架梁、柱的连接构造
砌体填充墙与主体结构的拉结及非承重墙体之间的拉结,根据不同情况可采用拉结钢筋、焊接钢筋网片、现浇混凝土水平系梁等做法。墙体拉结筋的预埋应满足设计要求及符合砌块模数的要求,使之顺直的埋设于砌体灰缝内。
(1)砌体填充墙的墙段长度大于 5m 时,墙顶应与梁底或板底拉结。
(2)当砌体填充墙的墙段长度超过层高 2 倍时,宜在墙内设混凝土构造柱。构造柱钢筋应上下与梁或板进行锚固连接,浇筑构造柱混凝土时应在梁底预留出50mm 空隙,后用 Cb20 灌孔混凝土填实。
(3)当砌体填充墙的墙高超过 4m 时,应在墙体半高处设置与混凝土墙或柱连接且沿墙全长贯通的现浇钢筋混凝土水平系梁。
(4)抗震设防区,砌体填充墙当出现自由端时,墙端应设置钢筋混凝土构造柱边缘约束,避免墙体存在明显抗震不利的情况。
(5)填充墙砌至接近梁、板底时,应留一定空隙,待填充墙砌筑完并至少间隔 7d 后,再将其补砌挤紧。填充墙砌筑后,砌体还将产生一定的徐变,施工不当,不仅会影响砌体与梁、板底的紧密结合,还会产生结合部位的水平裂缝。但究竟如何“补砌挤紧”,总的原则是墙体应与主体结构的柱、墙、梁和顶板进行可靠连接,抗震设防区梁或板下后砌墙顶部应有卡固措施。
6.结 语
综上所述,造成轻质砌体填充墙施工质量通病的原因很多,要从各方面考虑并采取控制措施,加强砌块的生产管理,保证材料的质量。并针对缝原因,精心设计、精心施工、严格监理才能建造出优品质的墙体,确保工程的质量。
参考文献
[1]《砌体填充墙结构构造》06SG614,中国计划出版社,2006..
[2]《非承重混凝土小型砌块砌体构造》GJ005-1998.
[3] 《砌体工程施工质量验收规范》GB 50203-2002,中国建筑工业出版社,2002.
[4]《蒸压加气混凝土砌块建筑构造》03J104,中国计划出版社,2008.
胡宗宝(1986.11-),男 ,安徽蚌埠,2010年毕业于安徽建筑工业学,本科,助理工程师,现从事于建筑工程项目管理工作
关键词:裂缝;原因分析;防治措施。
Abstract:With the introduction of restrictions on the use of sintered clay brick and a series of building energy efficiency standards for administrative measures, a variety of lightweight materials such as concrete, lime sand and small block filled with construction materials market. In particular, application framework and the framework of multi-storey shear wall structural system filled wall, but there will also have the problem of quality defects such as wall cracks, leakage, this paper, analysis and pointed out that the control measures for the crack problem.
Key words: crack; cause analysis; control measures.
中图分类号:TU5 文献标识码: A文章编号:2095-2104(2012)
1.砌块的质量问题及防治措施
(1)设计规定不能使用未达到龄期的砌块,但由于施工工期紧,砌块供不应求,部分砌块在未达到龄期时便已进场使用,并且很难测量砌块龄期。轻质混凝土砌块干缩变形很大,28天以内收缩变形值比28 天后大几倍。在龄期达到28 天前,其自身收缩较为明显,可达0.37mm/m,占最终收缩值的60%以上,随着强度的增加,它的收缩变形将越来越小。因此,为了保证砌体的强度,应使用达到强度的砌块。砌块的收缩变形会使墙体产生竖直裂缝,阶梯形裂缝、窗台边斜裂缝、框架柱与填充墙之间的裂缝。
(2)材料进场时应按不同品种,不同规格,不同批号分别堆放,避免施工时将不同规格的砌块混砌。因规格不同的砌块干密度不同,若混砌于同一道墙上会因砌块的含水率不同在墙体中出现不规则的裂缝。另外,墙体每日砌筑高度不能超过1.8m ,避免砌体沉缩变形过大。
2.设计不足产生的裂缝及防治措施
由于对新型材料的认识不足,在设计方面没有针对性预防措施和技术交底措施,且建筑物不均匀沉降,引起建筑物墙体结构内的附加应力,这是导致墙体产生剪拉斜向开裂或垂直弯曲开裂的主要原因。因此在实际施工中,会存在以下问题:
(1)门窗洞及预留洞边等部位的应力集中区,无采取有效的拉结加强措施时,由于撞击振动而容易开裂,因此在门窗洞口应布置适量的拉结筋保证其强度;
(2)后砌填充围护结构当墙体的尺寸与砌块规格不配时,难以用砌块完全填满,造成砌体与混凝土框架结构的连接部位孔隙过大而容易开裂,此时应采用粘土砖或用砂浆填满空隙;
(3)墙面开洞、安装管线等引起墙体变形而开裂,在砌墙时应预埋管线和预留洞口;
(4)墙厚度过小及砌筑砂浆强度过低,使墙体刚度不足也容易开裂,应采用符合强度要求的砂浆。
3.砌筑的施工问题及防治措施
(1)砌块在砌筑时应错缝搭砌,避免产生竖向裂缝。砌块与红砖不同,可以随意砍凿,因此在砌筑前应根据砌块的尺寸,认真编制排列图和设计皮数杆。基本原则是,砌块上下皮应错缝砌筑,搭接长度不宜小于块长的 1/3,个别条件下小砌块的搭接长度不应小于 90mm;竖向通缝不应大于 2 皮砌块,多孔砖应一顺一丁砌筑,并尽量避免设计宽度小于600mm 的窗间墙。
(2)砌块在砌筑时灰缝的宽度和砂浆饱满度应符合要求,避免因粘结力和强度不足产生裂缝,具体做法为:烧结空心砖、轻骨料混凝土小型空心砌块砌筑时,砖孔沿水平方向砌筑,要保证灰缝砂浆饱满,竖向缝砂浆应嵌进缝内深度不小于 15mm;每砌两皮砌块用原浆勾缝,水平灰缝和竖向灰缝宽度均应控制在 8~12mm;蒸压加气混凝土砌块宜用专用砂浆砌筑,水平和竖向灰缝宽度宜分别控制为 15mm 和 20mm。灰缝过厚和过宽,不仅浪费砂浆,而且灰缝的收缩也不利于砌体裂缝的控制,砌体灰缝饱满度均应不小于 80%。
(3)墙体中宽度大于 300mm 的预留洞口应设钢筋混凝土过梁,且伸入每边墙体的长度不应小于 250mm。
4.温差作用的原因
混凝土砌块墙体对温度的敏感性比砖砌体高,很容易受温度变化引起变形导致墙体开裂,溫度裂缝是造成墙体早期裂缝的主要原因。最常见的温度裂缝出现在混凝土平屋盖房屋的顶层两端墙体和山墙上。如在门窗洞边的正“八”斜裂缝、山墙上部的斜裂缝、平顶下或屋顶圈梁下沿砌块灰缝的水平裂缝、以及水平包角裂缝等。这些裂缝一般经过一处冬夏之后才逐渐稳定,不再继续发展,裂缝的宽度随着温度变化而略有变化。温度裂缝有明显的规律性;两端重中间轻,顶层重往下轻,阳面重阴面轻。因此在施工时应留置一定数量的预留缝,满足因温差引起的伸缩变形。
5.填充墙与框架梁、柱的连接构造
砌体填充墙与主体结构的拉结及非承重墙体之间的拉结,根据不同情况可采用拉结钢筋、焊接钢筋网片、现浇混凝土水平系梁等做法。墙体拉结筋的预埋应满足设计要求及符合砌块模数的要求,使之顺直的埋设于砌体灰缝内。
(1)砌体填充墙的墙段长度大于 5m 时,墙顶应与梁底或板底拉结。
(2)当砌体填充墙的墙段长度超过层高 2 倍时,宜在墙内设混凝土构造柱。构造柱钢筋应上下与梁或板进行锚固连接,浇筑构造柱混凝土时应在梁底预留出50mm 空隙,后用 Cb20 灌孔混凝土填实。
(3)当砌体填充墙的墙高超过 4m 时,应在墙体半高处设置与混凝土墙或柱连接且沿墙全长贯通的现浇钢筋混凝土水平系梁。
(4)抗震设防区,砌体填充墙当出现自由端时,墙端应设置钢筋混凝土构造柱边缘约束,避免墙体存在明显抗震不利的情况。
(5)填充墙砌至接近梁、板底时,应留一定空隙,待填充墙砌筑完并至少间隔 7d 后,再将其补砌挤紧。填充墙砌筑后,砌体还将产生一定的徐变,施工不当,不仅会影响砌体与梁、板底的紧密结合,还会产生结合部位的水平裂缝。但究竟如何“补砌挤紧”,总的原则是墙体应与主体结构的柱、墙、梁和顶板进行可靠连接,抗震设防区梁或板下后砌墙顶部应有卡固措施。
6.结 语
综上所述,造成轻质砌体填充墙施工质量通病的原因很多,要从各方面考虑并采取控制措施,加强砌块的生产管理,保证材料的质量。并针对缝原因,精心设计、精心施工、严格监理才能建造出优品质的墙体,确保工程的质量。
参考文献
[1]《砌体填充墙结构构造》06SG614,中国计划出版社,2006..
[2]《非承重混凝土小型砌块砌体构造》GJ005-1998.
[3] 《砌体工程施工质量验收规范》GB 50203-2002,中国建筑工业出版社,2002.
[4]《蒸压加气混凝土砌块建筑构造》03J104,中国计划出版社,2008.
胡宗宝(1986.11-),男 ,安徽蚌埠,2010年毕业于安徽建筑工业学,本科,助理工程师,现从事于建筑工程项目管理工作