Remote sensing data classification using tolerant rough set and neural networks

来源 :Science in China(Series D:Earth Sciences) | 被引量 : 0次 | 上传用户:visualhoxygen
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
BP algorithm of neural net is used more in remote sensing data classification. One of drawbacks of BP algorithm is the overall low function when the net is training. To avoid this kind of problem, the paper introduces the tolerant rough set for classification-preprocessing the training data to reduce the influence elements of the training convergence in order to improve the net training successful rate. ETM+ data of Beijing in May 2003 is selected in the study. ETM+ data before and after classification preprocessing, respectively, are used for BP (Back propaga-tion) training. The result shows that such a preprocessing not only compensates the drawback of BP algorithm when processing ETM+ data but also improves classification accuracy. BP algorithm of neural net is used more remote sensing data classification. One of drawbacks of BP algorithm is the overall low function when the net is training. To avoid this kind of problem, the paper introduces the tolerant rough set for classification-preprocessing the ETM + data before Beijing after May 2003 is selected in the study propaga- tion) training. The result shows that such a preprocessing not only compensates the drawback of BP algorithm when processing ETM + data but also improves classification accuracy.
其他文献
招标过程中的造价管理是建筑工程项目管理过程中的重要内容,加强招标过程中的造价管理对于建筑工程项目成本控制具有十分重要的意义。本文对造价管理在建筑工程招标过程中的作
建筑幕墙主要由面板及支撑结构组成,面板主要有玻璃、坚硬金属板、性能良好的人造板和石板等构成;面板后面起支撑作用的结构,支撑结构一般为钢结构,铝合金结构等性能良好,安
会议
在建设工程当中,管理好工程造价是控制工程项目成本的最主要措施,对整个工程的建设和管理工作也都有着重要的影响。施工阶段工程造价的控制是最为重要的,在施工的不同阶段都要进
建筑工程项目开发建设是我国经济社会发展过程中的一个重要组成部分,随着近年来建设事业的不断发展,加强建筑工程项目全过程的造价管理和成本控制具有重要的意义。本文对建筑工