介绍了针对神头第一发电厂三期机组的热工系统运行情况 ,采用INFI— 90分散控制系统对热工系统进行改造后的投运情况和体会。
The operation of the thermal system for Phase III of Shentou No. 1 Power Plant was introduced. The operation and experience of the thermal system after transformation by the INFI - 90 decentralized control system was introduced.