为了验证德兴铜精矿采用闪速熔炼工艺的可靠性,常州冶炼厂闪速熔炼试验车间(规模为日处理铜精矿100吨),自1976年6月至1978年5月共进行了三次试验,结果表明,德兴铜精矿采用闪速熔炼工艺是可行的和合理的,初步显示了闪速熔炼所具有的
In order to verify the reliability of the flash melting process of Dexing Copper Concentrate, the Changzhou Smelter Flash Smelting Test Workshop (size of 100 tons of copper concentrate on a daily basis) was carried out three times from June 1976 to May 1978 The results show that it is feasible and reasonable to adopt the flash smelting process for Dexing copper concentrate. The preliminary results show that the flash smelting has