Impounding相关论文
Stability of an ancient landslide in a reservoir area is analyzed by using centrifugal model tests, soil laboratory test......
PROBLEMSOFRESERVOIRSEDIMENTATIONINCHINAJiangNaisen(姜乃森)FuLingyan(傅玲燕)ChinaInstituteofWaterResourcesandHydropowerResearch,Beij.........
李家峡水电站坝前滑坡在蓄水前后一直处于活动状态,其危害是剧滑形成的坝前涌浪对大坝安全带来影响.本文通过对电站坝前滑坡体的勘......
In this study, the behavior of Gavoshan dam was evaluated during construction and the first impounding. A two-dimensiona......
三峡工程作为目前世界最大的水利水电枢纽工程,历经勘测、论证、设计各个阶段,由于规模巨大、技术复杂、安全要求高,建设过程中对......
三峡水库新增抗旱和生态功能,其汛末蓄水时间和方式的选定不仅要考虑防洪、发电、航运等效益,还需兼顾下游抗旱补水和生态用水需求。......
以云南省龙川江流域为例,研究了流域内局部与整体的地貌形态特征,并预测了径流发育发展趋势。以ASTER-GDEM数据为基础,Arc GIS水文......
Assessment of the Impact of the Grand Ethiopian Renaissance Dam on the Performance of the High Aswan
A Large scale hydropower dam known as Grand Ethiopian Renaissance Dam (GERD) is under construction on the Blue Nile Rive......
本文介绍了水电建设工程安全鉴定的有关规定和要求;通过引子渡工程的蓄水安全鉴定工作,介绍其组织方式等,并对其成功经验进行了总......