Remaining strength test of riveted joint of a bridge used for about 1O0 years

来源 :The 7th International Conference on Bridge Maintenance, Safe | 被引量 : 0次 | 上传用户:tchrt
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
  In japan,the very real social problem of the corrosion damage associated with aging has reared its ugly head in the case of steel bridges.Old bridges erected in previous eras used riveted joints,and we need to accurately assess and understand the remaining strength of corroded riveted joints to recover their performance and prolong their life.This kind of research is quite rare,and it is clear that numerous basic data needs to be accumulated in the future.Thus,in this study,riveted joint parts are removed from old plate girder bridges and,using processed specimens,performed single and double shear strength tests on tensile loaded rivets in order to investigate the joint strength and failure type of the corroded riveted joints.At the same time,survey and component analyses of internal defects in the base material and splice plates,as well as just the rivets,were carried out.It should be noted that both the Amarube and Ananaigawa bridges were dismantled after 100 years of service.
其他文献
After experiencing huge natural disasters such as earthquakes and typhoons people are becoming more concemed with the safety of bridges.As a matter of fact,it was more than 18 years ago on 17th of Jan
会议
A detailed riparian field study to assess the importance of bedrock groundwater in streamflow processes was established in the headwaters of the Afon Hafren,midWales,UK.Results from this study identif
会议
Through the history,bridges are designed for varying traffic loads,and designs are made using varying assessments methods.In long-term,weight of permitted vehicles tends to increase over time.To serve
会议
The diagonal crack in the webs of box-girder has been one of the most common diseases in long-span prestressed concrete box-girder bridges in recent years.One of the key reasons is the great prestress
会议
The structural design aims at minimizing the total cost without compromising the functional requirements.The design has to ensure structural integrity by considering the entire life cycle,from design
会议
The use of dynamic programming algorithms for the optimization Markov Decision Processes (MDPS)related to the Inspection,maintenance and rehabilitation (IM&R) decisions of civil engineering facilities
会议
The Precast Segmental Bridge Piers (PSBP) is composed of precast elements joined together by means of wet joints.There have been a number of joints proposed for application of PSBP in regions with mod
会议
Long span bridges are regularly subjected to the simultaneous presence of multiple vehicles,resulting in high traffic volumes,the behaviour of which is governed by drivers/vehicle interaction such as
会议
Bridge expansion joints require inspection and maintenance throughout their lives,and replacement at the end of these lives,and these activities result in considerable costs to the bridge owner and im
会议
In the responsible management of any construction project or asset,life-cycle considerations must be to the fore.This is now widely recognised,even if this has,to a large extent,regrettably not yet tr
会议