宝钢焦化厂综合电气室是焦化厂备煤、炼焦系统最大的电气控制室和指令操作室。该建筑为长50m、宽12m,高18m的三层钢筋混凝土框架结构,砖填充墙。该电气室由日本新日铁设计,1980年初动工,1981年底土建工程完毕,1982年4月运进设备并安装、调试,正常后进入设备保养阶段。计算机房一直保持温度22℃±20℃、湿度55%±15%的恒温恒湿状态。1983年1月发现计算机房吊顶内有结露水,1984年1~3月结露继续产生。
The comprehensive electrical room of Baosteel Coking Plant is the largest electrical control room and command operation room for coal preparation and coking systems in coking plants. The building is a three-story reinforced concrete frame structure with a length of 50m, a width of 12m and a height of 18m, and a brick-filled wall. The electrical room was designed by Nippon Steel Corporation of Japan. It was started in early 1980. The civil engineering project was completed at the end of 1981. It was shipped into the equipment and installed and commissioned in April 1982. After normal, it entered the equipment maintenance stage. The computer room has maintained a constant temperature and humidity of 22°C±20°C and humidity of 55%±15%. In January 1983, dew condensation occurred in the ceiling of the computer room, and condensation continued to occur from January to March 1984.